Roadmap to Save $1 Million per Project
In a previous post, we examined why a Navigant survey of One Million RFI’s found that the average RFI costs
Read MoreIn a previous post, we examined why a Navigant survey of One Million RFI’s found that the average RFI costs
Read More“Hey I didn’t design this, what does this mean here? I can’t install what I don’t understand.” So we ask!
Read MoreWhat are your biggest challenges these days? Most of us can agree that we get generally poor results with Design/Bid/Build as
Read MoreBy Andy Fulton The triangle below shows the separate but interdependent nature of a CM-at-Risk (CMAR) contract (commercial terms) with
Read MoreWe’ve covered “When Should PreCon Begin?” and “Who and What Should PreCon Include?” Now from our 75+ world-wide experts, from
Read More“We do not win on the project – we win in PreConstruction.” – Jason Schroeder On a sliding scale, the
Read MoreLOOKING BACKThe term “Preconstruction” (“PreCon” for short) is vague and its meaning and content has been evolving over the decades.
Read MoreTVD is gaining ground fast with owners, often emerging as a contractual requirement—and for good reason. Why wouldn’t a client
Read MorePrecast highrise facades are regaining ground for several reasons: low cost per square foot, compliance with new energy codes (maximum
Read MoreThis blog post discusses the use of Last Planner® in Design, and the language used here can be easily incorporated
Read More